DETAILS
LOCATION: LONDON, UK
AREA: 6,200M2
DATE: COMPLETED 2003
SERVICES
ENVIRONMENTAL DESIGN CONSULTING
BUILDING SERVICES DESIGN
LEED GOLD
Strategy
The low floor to ceiling height in the building required an innovative solution to the air-conditioning and lighting systems and the preferred solution, a ventilated chilled beam system, offers excellent flexibility and control while maintaining storey height between the beams.